An event in the Corda Arena: an audience facing a lit stage with large screens, with packed balconies along the sides.

A 10Gbps line for the Corda Arena

How Wave C got a temporary test connection running inside the Corda Arena as soon as the building was dust-free, and then delivered the full 10Gbps Enterprise Fiber line.

Let’s make some Wave-C.

Sector
Events & entertainment venue (Corda Arena)
Product
Enterprise Fiber
Result
First a test line well before opening, now the full 10Gbps line.

The Corda Arena needed a 10Gbps internet line that practically never goes down. That line has to carry event livestreams, VR experiences and visitor Wi-Fi at the same time. In a large venue full of people, the connection can't drop during an event.

As soon as the building was dust-free, Wave C brought its network into the Arena and delivered a temporary test line. Wave C didn't wait for the finishing work to be done. That let both teams test the setup well before opening.

The test line let both teams try out the setup well before opening. The full 10Gbps Enterprise Fiber line has since been delivered. The Arena's network is ready for every event.

The Arena is already connected to Wave C's Campus Connect network. That let Wave C put together a tailored offer for events too: temporary extra lines can be set up per event. Event traffic then stays off the Arena's own line.

Do you need this much bandwidth too?

Planning events, VR experiences or lots of visitors on your network? Ask us, without obligation, what a 10Gbps Enterprise Fiber line can do for your building, before opening night.

Request advice

Read next

Contact